Optical Sensor Installation
The optical sensor can be mounted in any reservoir with a wall thickness under 1/2″ at the level you wish to fill it up to. The cable should be positioned vertically which will stack the optical eyes, allowing it to utilize the dual sensors. The sensor can be placed in a bright room or even in complete darkness.
Solenoid Valve Installation
RO/DI System without an Auto Shut Off Valve – The solenoid valve should be placed between your RO/DI systems pre-filters and the membrane. It is important to place the solenoid after sediment filters, or even better after carbon blocks to remove any particulates that could clog the solenoid valve. Installing the valve before your RO/DI system can cause the solenoid valve to fail prematurely.
RO/DI System with an Auto Shut Off Valve – The solenoid valve can be placed anywhere after your DI and before the water enters your reservoir. This method will let you use your RODI system like normal if you split the RO or DI water off to any other reservoirs while allowing the XP RO/DI Flood Guardian to work properly on its own.
Specifications:
Max Mounting Thickness – 1/2″
Solenoid Power Consumption – 6W @ 12V
Universal Tubing Diameter – 1.2″ (30.5m)
What’s Included?
1x RO/DI Flood Guardian Dual Optical Sensor
1x RO/DI Flood Guardian Controller with Power Supply
1x RO/DI Flood Guardian Solenoid Valve
1x RO/DI Flood Guardian Tubing Mount